Any individual who wants to renovate his apartment should have some idea about the difficulties, interests and plans related to the renovation. You can get information about all this below:
It is often said that apartment renovation is carried out in stages and with certain difficulties, and what are these stages and difficulties?
What should a repairman do?
First, the renovation of each apartment mainly depends on how much budget is allocated. After the budget is clarified, the phased process of apartment renovation begins. First of all, the designer draws up a project, i.e. apartment planning and 3D modeling, according to the preferences and suggestions of the owner. After agreeing on the project with the owner of the apartment, the transition is made to the second stage - drawing up an estimate.
What should a repairman do?
In that case, you will need to have some idea of what kind of apartment you want to get, it will be good to have some pictures, catalogs and ideas on hand. All this is necessary to move to the next stage, that is, the preliminary calculation.
So what is an estimate and why is it important to have one?
When renovating apartments, there are two main estimates: one for the materials used, and the other for the work to be performed. It is thanks to these two that the owner of the apartment knows in advance, before starting the repair, how much money he will spend on what.
The first, the bill of materials, includes the materials used, their quantity and cost. And the second one, the estimate of works to be performed, includes the works to be performed, their surfaces and values.
The next stage, which is carried out along with the preparation of the estimate, is the selection of materials and certain years related to the repair (electricity, plumbing, heating, etc.). The values of materials and works depend on these choices.
After the elections, the repair process begins. it often happens that the selections and estimates are carried out during the renovation works, depending on the urgency of the customers.
The renovation, in turn, proceeds in sub-stages, first, dismantling works are carried out, if there is a need, then the rest of the process begins: construction of rooms, finishing of walls, ceiling and floor, laying of electrical wires, water pipes and heating systems, finishing of walls and assembling the floor.
Many of these processes are carried out jointly, depending on the number of craftsmen employed.
After finishing the finishing process, the furnishing and finishing of the apartment begins. Furnishing the apartment is considered the most expensive stage in the renovation, of course, this depends on the wishes of the client, firstly the design and then the materials.
However, perhaps the furniture is considered the most expensive, but it is the furniture that gives the apartment comfort and luxury. and finally, if you want to move to a new apartment a few days after finishing the renovation, you should contact the furniture makers in advance, at least 20 days before finishing the renovation, to furnish the apartment.